Sample projects · SP-03 · Instrumentation

SAMPLE PROJECT

Chemical dosing and filtration skid

A packaged chemical dosing and multimedia filtration skid: flow-paced dosing pumps, differential pressure across each filter, and pH and chlorine analysers, tagged to ISA-5.1 with a loop diagram for every loop.

SheetSP-03
RevA
ServiceINSTRUMENTATION
ScaleNTS

Specification

Standard

ISA-5.1 · ISA-5.4

Scope

38 instruments · 4–20 mA / HART

Sheets

18 HOLD

Platform

AutoCAD Electrical HOLD

Deliverables

  • P&ID development and markups
  • Instrument index and datasheet summary
  • Loop diagrams (ISA-5.4)
  • Installation hookup details
  • Junction box and cable schedules

Preview · I-101

SP-03 · I-101 · NTS

Drawing index

SheetTitle
I-001Cover sheet and drawing index
I-101P&ID: dosing system
I-102P&ID: filtration
I-201Instrument index
I-301Loop diagram: FIT-102 / FCV-102
I-302Loop diagram: AIT-103 pH
I-303Loop diagram: PDIT-110 filter DP
I-401Hookup: flow transmitter
I-402Hookup: analyser panel
I-501Junction box JB-101 layout
I-601Cable schedule

Drawing sheets

Sheet image
to come
I-101P&ID: dosing system
Sheet image
to come
I-102P&ID: filtration
Sheet image
to come
I-201Instrument index
Sheet image
to come
I-301Loop diagram: FIT-102 / FCV-102
Download full set (PDF)HOLD

Next step

Need a drawing set like this one?

Send the scope or book a short call. I reply within one business day. HOLD

This is an original sample project made for this portfolio. It is not client work and is not issued for construction.

Firmthecontrolsengineer
Drawn byTCE
Date2026-10-03
SheetSP-03
©2026
← All projects