Sample projects · SP-03 · Instrumentation
SAMPLE PROJECTChemical dosing and filtration skid
A packaged chemical dosing and multimedia filtration skid: flow-paced dosing pumps, differential pressure across each filter, and pH and chlorine analysers, tagged to ISA-5.1 with a loop diagram for every loop.
SheetSP-03
RevA
ServiceINSTRUMENTATION
ScaleNTS
Specification
Standard
ISA-5.1 · ISA-5.4Scope
38 instruments · 4–20 mA / HARTSheets
18 HOLDPlatform
AutoCAD Electrical HOLDDeliverables
- P&ID development and markups
- Instrument index and datasheet summary
- Loop diagrams (ISA-5.4)
- Installation hookup details
- Junction box and cable schedules
Preview · I-101
Drawing index
| Sheet | Title |
|---|---|
| I-001 | Cover sheet and drawing index |
| I-101 | P&ID: dosing system |
| I-102 | P&ID: filtration |
| I-201 | Instrument index |
| I-301 | Loop diagram: FIT-102 / FCV-102 |
| I-302 | Loop diagram: AIT-103 pH |
| I-303 | Loop diagram: PDIT-110 filter DP |
| I-401 | Hookup: flow transmitter |
| I-402 | Hookup: analyser panel |
| I-501 | Junction box JB-101 layout |
| I-601 | Cable schedule |
Drawing sheets
Sheet image
to come
to come
Sheet image
to come
to come
Sheet image
to come
to come
Sheet image
to come
to come
Download full set (PDF)HOLD
Next step
Need a drawing set like this one?
Send the scope or book a short call. I reply within one business day. HOLD
This is an original sample project made for this portfolio. It is not client work and is not issued for construction.