thecontrolsengineer Get notified

Sample projectsSP-03Instrumentation

Sample project

Chemical dosing and filtration skid

A packaged chemical dosing and multimedia filtration skid: flow-paced dosing pumps, differential pressure across each filter, and pH and chlorine analysers, tagged to ISA-5.1 with a loop diagram for every loop.

SheetSP-03RevAServiceINSTRUMENTATIONScaleNTS
Preview · I-101SP-03 · NTS

Specification

What's in the set.

StandardISA-5.1 · ISA-5.4
Scope38 instruments · 4–20 mA / HART
Sheets18 HOLD
PlatformAutoCAD Electrical HOLD

Deliverables

  1. P&ID development and markups
  2. Instrument index and datasheet summary
  3. Loop diagrams (ISA-5.4)
  4. Installation hookup details
  5. Junction box and cable schedules

Drawing index

11 sheets, one package.

Every sheet in the set, in issue order. The red nodes are previewed below.

  1. I-001Cover sheet and drawing index
  2. I-101P&ID: dosing system
  3. I-102P&ID: filtration
  4. I-201Instrument index
  5. I-301Loop diagram: FIT-102 / FCV-102
  6. I-302Loop diagram: AIT-103 pH
  7. I-303Loop diagram: PDIT-110 filter DP
  8. I-401Hookup: flow transmitter
  9. I-402Hookup: analyser panel
  10. I-501Junction box JB-101 layout
  11. I-601Cable schedule

Drawing sheets

On the sheet.

Sheet image
to come
I-101P&ID: dosing system
Sheet image
to come
I-102P&ID: filtration
Sheet image
to come
I-201Instrument index
Sheet image
to come
I-301Loop diagram: FIT-102 / FCV-102
Download full set (PDF)HOLD

Next step

Want a set like this?

Bookings open soon. Ask to be notified and you'll hear first when they do.

This is an original sample project made for this portfolio. It is not client work and is not issued for construction.

© 2026 thecontrolsengineerDrawn by TCE · Sheet SP-03← All projects