thecontrolsengineer
Control panel, machine and instrumentation design for integrators and panel builders.
Bookings opening soon.
The idea
Morecapacity.No newhire.Checkeddrawings.
Busy shops don't need another job ad. They need checked drawings, on time, in their own title block.
Panels to UL 508A or IEC 61439. Machines to NFPA 79 or IEC 60204-1. Instrumentation tagged to ISA-5.1. Drafted in EPLAN or AutoCAD Electrical, the way your shop already works.
A written checklist on every sheet, so your review is about design, not typos.
Services
Three services. One design desk.
Sample projects
Open the drawing set before the PO.
Six sample packages, two per service, across UL, NFPA, IEC and ISA standards. Each opens its own drawing set: the sheets, the detail and the standards you'd get on your own job.
SP-01 · Control panel
Duplex pump station control panel
Open drawing set →SP-02 · Machine automation
Case packer conveyor line
Open drawing set →SP-03 · Instrumentation
Chemical dosing and filtration skid
Open drawing set →SP-04 · Control panel
Process cooling skid control panel
Open drawing set →SP-05 · Machine automation
Robotic palletising cell
Open drawing set →SP-06 · Instrumentation
Boiler feedwater and steam instrumentation
Open drawing set →Sample projects are original designs made for this portfolio. They are not client work and are not issued for construction.
Process
How a job runs, start to finish.
- S0Day 0
Send the brief
Email what you have: P&IDs, a sequence of operation, red-line markups, an I/O list, even a photo of a hand sketch. Tell me the standard, your CAD platform and the date you need it.
- In
- Drawings or markups · Sequence of operation · Title block & templates
- Out
- NDA signed on request
→ Brief received
- S1≤ 1 business day HOLD
Scope & fixed quote
You get a written scope: deliverables, estimated sheet count, assumptions, exclusions and delivery date, at a fixed price, so there are no hourly surprises.
- Out
- Scope & quote (PDF)
→ Quote accepted, PO issued
- S2Day 1 · 30 min
Kickoff call
A short call in your morning. We lock the standard, symbol library, wire and device numbering, title block and who reviews the drawings.
- Out
- Kickoff notes · Drawing conventions sheet
→ Conventions confirmed
- S35–15 business days HOLD
Draft & self-check
Drawings are built in your platform. Every sheet is checked against a written checklist: cross-references, wire numbers, terminal assignments, SCCR and code clearances.
- Out
- Progress update every 2 days HOLD
→ Checklist passed
- S4Rev A
Issue for review
You receive PDFs plus native files (EPLAN project or AutoCAD Electrical drawing set), with the bill of materials and wire schedule in Excel.
- Out
- Rev A package · Native CAD files · BOM · Wire schedule
→ Markups returned
- S5Rev 0
Revise & issue for construction
Markups are worked in within 2 business days per round, and two rounds are included. The set is then issued for construction as Rev 0.
- Out
- Rev 0 package · Native CAD files
→ Rev 0 issued, ready for the next job