thecontrolsengineer Get notified

thecontrolsengineer

Control panel, machine and instrumentation design for integrators and panel builders.

Bookings opening soon.

© thecontrolsengineer 2026UL 508A / IEC 61439 · NFPA 79 / IEC 60204-1 · ISA-5.1Get notified

The idea

Morecapacity.No newhire.Checkeddrawings.

Busy shops don't need another job ad. They need checked drawings, on time, in their own title block.

Panels to UL 508A or IEC 61439. Machines to NFPA 79 or IEC 60204-1. Instrumentation tagged to ISA-5.1. Drafted in EPLAN or AutoCAD Electrical, the way your shop already works.

A written checklist on every sheet, so your review is about design, not typos.

Just issue-ready drawings.for integrators, panel builders and machine builders

Services

Three services. One design desk.

Sample projects

Open the drawing set before the PO.

Six sample packages, two per service, across UL, NFPA, IEC and ISA standards. Each opens its own drawing set: the sheets, the detail and the standards you'd get on your own job.

Sample projects are original designs made for this portfolio. They are not client work and are not issued for construction.

Process

How a job runs, start to finish.

Typical job2–3 weeks HOLD
Overlap with your day4 h HOLD
Review rounds2 HOLD
  1. S0Day 0

    Send the brief

    Email what you have: P&IDs, a sequence of operation, red-line markups, an I/O list, even a photo of a hand sketch. Tell me the standard, your CAD platform and the date you need it.

    In
    Drawings or markups · Sequence of operation · Title block & templates
    Out
    NDA signed on request

    → Brief received

  2. S1≤ 1 business day HOLD

    Scope & fixed quote

    You get a written scope: deliverables, estimated sheet count, assumptions, exclusions and delivery date, at a fixed price, so there are no hourly surprises.

    Out
    Scope & quote (PDF)

    → Quote accepted, PO issued

  3. S2Day 1 · 30 min

    Kickoff call

    A short call in your morning. We lock the standard, symbol library, wire and device numbering, title block and who reviews the drawings.

    Out
    Kickoff notes · Drawing conventions sheet

    → Conventions confirmed

  4. S35–15 business days HOLD

    Draft & self-check

    Drawings are built in your platform. Every sheet is checked against a written checklist: cross-references, wire numbers, terminal assignments, SCCR and code clearances.

    Out
    Progress update every 2 days HOLD

    → Checklist passed

  5. S4Rev A

    Issue for review

    You receive PDFs plus native files (EPLAN project or AutoCAD Electrical drawing set), with the bill of materials and wire schedule in Excel.

    Out
    Rev A package · Native CAD files · BOM · Wire schedule

    → Markups returned

  6. S5Rev 0

    Revise & issue for construction

    Markups are worked in within 2 business days per round, and two rounds are included. The set is then issued for construction as Rev 0.

    Out
    Rev 0 package · Native CAD files

    → Rev 0 issued, ready for the next job